Message boards : BOINC Manager : Ambiguous scale in all-projects statistics
Message board moderation
Author | Message |
---|---|
Send message Joined: 27 Sep 06 Posts: 3 |
I've noticed on occasion, in BOINC Manager's "Statistics" tab, in the "All projects" mode view that displays one small credit graph per project, that at least one of the graphs (climateprediction.net at the moment) displays only a single number on the y-axis. Since these graphs aren't inherently zero-based, they need at least two numbers to provide the scale. With only one, if the number is 50, I know that any date that pegs my contribution on that line is 50, but if it goes down the next day, I have no way to know if it dropped to 49 or 4.9 (or even -300, for that matter, assuming negative numbers mean something). Is this bug known to the development team? Regards, Jeff Q |
Send message Joined: 29 Aug 05 Posts: 15563 |
The graphics had an overhaul not too long ago, so the question is, which version of BOINC do you use? 6.10 or 6.12? |
Copyright © 2024 University of California.
Permission is granted to copy, distribute and/or modify this document
under the terms of the GNU Free Documentation License,
Version 1.2 or any later version published by the Free Software Foundation.